Equipment maintenance integration case-Nanjing Port

Time:2020-06-05

Hits:936

Project Description:

       In November 2018, Golink Equipment actively participated in the construction of the maintenance and integration project of Nanjing Port Group with its accumulated experience and capabilities in the overall project services of the port and terminal, and successfully won the Nanjing Port Machinery Heavy Industry Manufacturing Co., Ltd. Nanjing Port Xinshengwei Port District Point maintenance contract.

       In accordance with the requirements of Jiangsu Port Group's work deployment, Nanjing Port Group promotes the reform of the group's maintenance integration, taking the integration of electric equipment maintenance in the Xinshengwei Port District as the pilot, and taking Nanjing Port Machinery Heavy Industry as the main body to optimize the maintenance operation system and assessment mode To explore the formation of an integrated operation and management model of facilities and equipment maintenance that can be replicated and promoted, to provide services for port production and operation.

Main equipment for annual maintenance and repair services of mechanical equipment:

       10t-40t large door cranes, 39 floating cranes
       38 10t-40t forklifts
       44 loader
       More than 100 sets of 30t site tire cranes/25t-40t gantry cranes and various horizontal transportation machinery

       2 sets of interconnected professional loading and unloading belt conveyor systems